Change
orders have a negative impact on the Architect, the Owner, and the project
schedule. We want to work with you to simplify the complexity
and make sure everything is shown. Please
contact us early in the design phase so we can work together to be sure
that the drawings include the following items:
3
Phase Electric Supply and Fused Disconnect within 3' of the
Main Control Console (Circuit Breaker Amperage varies by the
motor HP and Voltage supply).
115V Outlet Receptacle
on a clean 20 Amp circuit within 3' of the Main Control Console.
Compressed Air, Filtered
and Regulated to 65psi with a Shut-Off and Tee within 3' of
the Main Console.
Underslab Conduits
for Electric and Hydraulic service lines from inside the Main
Console to the back of the service legs on each platform.
The routing for getting
the 3 Ph, 115V and Air to the Main Console, i.e. Overhead, Along
the Wall, or Under the Slab.
If the slab is reinforced
with bars, Notations about bars not interfering with the Baseplate
Wedge Anchors to be Drilled-in-Place.
Concrete Cross-Sections
and Embedments
We
add value to the specialized products we sell by servicing the owners,
architects and engineers early in the design phase. We can help make
your project a success for all parties involved if you utilize
the following services offered exclusively by Lif-Tech.
Architectural
Engineering Services Value
Added Consulting Services Offered by Lif-Tech Equipment
Site
Visits and Facility Surveys
Fleet
Inspections to Determine Lift Requirements and Identify Constraints
Facilities
Planning and Construction Drawing Reviews
Site
Specific CADD Drawings
Specifications
Drawings
by Model No. with Equipment Foundation Requirement
Send us your floor plan via e-mail and we will return the drawings back
to you with the lift
and all underslab conduits shown!
PLEASE CONTACT
GARY OR ALLAN FOR DRAWINGS, SPECIFICATIONS AND THE DETAILS RELEVANT
TO YOUR PROJECT DESIGN. WE WILL DO EVERYTHING WE CAN TO HELP.